Bullet and Blast Proofing Of Infrastructure

The worst injuries from bombings come from two areas: flying glass and debris, and incendiary effects. Bomb blast protection is all about making sure that, if a bomb would go off, injuries of this kind would be kept to an absolute minimum – even in crowded areas.

There are two ways to keep the injuries to minimum.

  1. Blast Proofing of Glass
  2. Armored Wall which is retrofit system on the walls is designed
    to take up minimal space, be quick to install and provide the highest levels of protection for occupants or critical equipments.

The application can be for

  • Retrofit
  • Office Buildings – government, public agencies and commercial
  • Protected spaces within buildings
  • Security control rooms or crisis management centers
  • Military accommodation
  • Fire stations / civil defsys facilities
  • Data centers
  • Telephone exchanges
  • Petrochemical control rooms
  • Railway signaling centers and control rooms
  • Commercial properties adjacent to hazardous sites

The blast proofing of walls is done by taking into consideration detailed panel specifications, structural loadings and behavioral predictions according to the building and threat.

  • Panel Specifications Panel width on face 1.25 m Panel Height As wall height
  • Thickness Panels 20mm Fixings 110mm
  • Weight Panel areal density 15 Kg/m2
  • Fittings per panel width 22 Kg
  • Fire Retardant Panel face materials meet BS476 Part 6/7 (Class 1)
 
Copyright © WW Defsys. All rights reserved